Stormwater - Beacon Hill

DY Plumbers • March 16, 2026

Stormwater - Beacon Hill

New stormwater drainage

STORMWATER – BEACON HILL

After the heavy rain earlier this year, it became clear the stormwater system wasn’t performing as it should. The property experienced flooding, and the on-site detention tank wasn’t draining.

While attempting to clear the line, we discovered the existing pipework didn’t match the approved stormwater plans, so a new solution was required. The system was rerouted, directing water into a charged line connected to two new pits, along with the installation of a grated drain to better capture surface runoff from the driveway and lawn areas.

All pipework and concrete were repaired and tested, the site was cleaned, and the lawn was returfed. The stormwater system is now fully operational and functioning as intended and looks like we were never there. #deewhyplumbers #stormwater #drainage


New plumbing ute.
By DY Plumbers August 24, 2026
Keep an eye out for our new Ute and give us a wave. Same team, different mode of transport.
#deewhyplumbers #peaceofmind #safetravels #leakfix #northernbeaches
By DY Plumbers June 16, 2026
Heading away from the Northern Beaches these school holidays?
With Winter arriving the race is on for hot showers. Is your hot water heater ready?
By DY Plumbers June 4, 2026
Winter is here - is your hot water ready?
Burst flexible connector due to rusting and fraying.
By DY Plumbers May 13, 2026
Another reminder today why you should check your flexible connectors for any signs of rusting or fraying before they burst like these ones did. #dyplumbers #burst #flexibleconnector #leak
More Posts
Read More Posts

Plumbing Problems? Consider Them Solved With DY Plumbers

We give you the benefit of several booking times that fit seamlessly to your busy schedule.